Commission Regulation (EU) No 774/2010 of 2 September 2010 on laying down guidelines relating to inter-transmission system operator compensation and a common regulatory approach to transmission charging Text with EEA relevance
Commission Regulation (EU) No 774/2010of 2 September 2010on laying down guidelines relating to inter-transmission system operator compensation and a common regulatory approach to transmission charging(Text with EEA relevance)THE EUROPEAN COMMISSION,Having regard to the Treaty on the Functioning of the European Union,Having regard to Regulation (EC) No 1228/2003 of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricityOJ L 176, 15.7.2003, p. 1., and in particular Article 8(1) thereof,Whereas:(1)Regulation (EC) No 1228/2003 provides for the establishment of an inter-transmission system operator compensation mechanism. In accordance with that Regulation, the Commission is to establish the guidelines specifying details of the procedure and methodology to be applied in the inter-transmission system operator compensation mechanism and appropriate rules leading to a progressive harmonisation of the setting of charges under national tariff systems.(2)Valuable experience has been gained since the need for intertransmission system operator compensation mechanism was first recognised, in particular through voluntary mechanisms by transmission system operators. However, transmission system operators have found it increasingly difficult to reach agreement on such voluntary mechanisms.(3)Binding guidelines establishing an inter-transmission system operator compensation mechanism should provide a stable basis for the operation of the inter-transmission system operator compensation mechanism and fair compensation to transmission system operators for the costs of hosting cross border flows of electricity.(4)Transmission system operators from third countries or from territories which have concluded agreements with the Union whereby they have adopted and are applying Union law in the field of electricity should be entitled to participate in the inter-transmission system compensation Mechanism on an equivalent basis to transmission system operators from Member States.(5)It is appropriate to allow transmission system operators in third countries which have not concluded agreements with the Union whereby they have adopted and are applying Union law in the field of electricity to enter into multi-party agreements with the transmission system operators in the Member States which enable all parties to be compensated for the costs of hosting cross-border flows of electricity on a fair and equitable basis.(6)Transmission system operators should be compensated for energy losses resulting from hosting cross border flows of electricity. Such compensation should be based on an estimate of what losses would have been incurred in the absence of transits of electricity.(7)A fund should be established to compensate transmission system operators for the costs of making infrastructure available to host cross border flows of electricity. The value of this fund should be based on a Union wide assessment of the long run average incremental costs of making infrastructure available to host cross border flows of electricity.(8)Transmission system operators in third countries should face the same costs for using the Union transmission system as transmission system operators in Member States.(9)Variations in charges applied to producers of electricity for access to the transmission system should not undermine the internal market. For this reason average charges for access to the network in Member States should be kept within a range which helps to ensure that the benefits of harmonisation are realised.(10)The measures provided for in this Regulation are in accordance with the opinion of the Committee set up by Article 13 of Regulation (EC) No 1228/2003,HAS ADOPTED THIS REGULATION: