Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003 (Text with EEA relevance)
- No longer in force
- CELEX number: 32009R0714
- Official Journal: JOL_2009_211_R_0015_01
- Form: Regulation
- Procedure number: 2007/0198(COD), 2007/0198/COD
- Languages:
- bg
- cs
- da
- de
- el
- en
- et
- fi
- fr
- ga
- hr
- hu
- it
- lv
- lt
- mt
- nl
- pl
- pt
- ro
- sk
- sl
- es
- sv
Dates
Date of document: - July 13, 2009
- August 14, 2009
- September 3, 2009
- Entry into force - Date pub. + 20 See Art 26
- March 3, 2011
- Application - See Art 26
- December 31, 2019
- Repealed by 32019R0943
Modified by
Modified by:
- Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance - detail
- Commission Regulation (EU) No 543/2013 of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to Regulation (EC) No 714/2009 of the European Parliament and of the Council Text with EEA relevance - detail
All documents based on this document:
- Commission Regulation (EU) No 838/2010 of 23 September 2010 on laying down guidelines relating to the inter-transmission system operator compensation mechanism and a common regulatory approach to transmission charging Text with EEA relevance
- Commission Regulation (EU) No 543/2013 of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to Regulation (EC) No 714/2009 of the European Parliament and of the Council Text with EEA relevance
- Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (Text with EEA relevance)
- Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators (Text with EEA relevance)
- Commission Regulation (EU) 2016/1388 of 17 August 2016 establishing a Network Code on Demand Connection (Text with EEA relevance)
- Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)
- Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (Text with EEA relevance)
- Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance. )
- Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing (Text with EEA relevance. )
- Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restoration (Text with EEA relevance. )
Affected by case
- Judgment of the Court (Third Chamber) of 11 March 2020. Baltic Cable AB v Energimarknadsinspektionen. Request for a preliminary ruling from the Förvaltningsrätten i Linköping. Reference for a preliminary ruling — Internal market for electricity — Directive 2009/72/EC — Transmission of electricity — Concept of ‘transmission system operator’ — Regulation (EC) No 714/2009 — Interconnector — Transmission line connecting the national transmission systems of the Member States — Article 16(6) — Scope — Use of revenues resulting from the allocation of interconnection capacity — Undertaking which merely operates a cross-border high-voltage power line connecting two national transmission networks. Case C-454/18.
- A16P6L1LB
- A16P6L2
- A16P6
- Judgment of the Court (Fifth Chamber) of 26 October 2017. Balgarska energiyna borsa AD (BEB) v Komisia za energiyno i vodno regulirane (KEVR). Request for a preliminary ruling from the Administrativen sad Sofia-grad. Reference for a preliminary ruling — Articles 101 and 102 TFEU — Directive 2009/72/EC — Articles 9, 10, 13 and 14 — Regulation (EC) No 714/2009 — Article 3 — Regulation (EU) No 1227/2011 — Article 2(3) — Regulation (EU) 2015/1222 — Article 1(3) — Certification and designation of an independent transmission system operator — Limitation of the number of holders of electricity transmission licences in national territory. Case C-347/16.
- A03
- Case C-347/16: Request for a preliminary ruling from the Administrativen sad Sofia-grad (Bulgaria) lodged on 21 June 2016 — Balgarska energiyna borsa AD (BEB) v Komisia za energiyno i vodno regulirane (KEVR)
- Case C-454/18: Request for a preliminary ruling from the Förvaltningsrätten i Linköping (Sweden) lodged on 12 July 2018 — Baltic Cable AB v Energimarknadsinspektionen
- article 16 paragraph 6
- article 16 paragraph 6 L 1 point (b)
- article 16 paragraph 6 L 2
Legal basis
- Treaty establishing the European Community (consolidated version) Part Five - Institutions of the Community TITLE I - Provisions governing the institutions Chapter 2 - Provisions common to several institutions Article 251
- Treaty establishing the European Community (consolidated version) Part Three - Community policies TITLE VI - Common rules on competition, taxation and approximation of laws Chapter 3 - Approximation of laws Article 95
EuroVoc Vocabulary
- Annex 4 Provisions of Union law referred to in Article 9
- Electricity
- Energy
- Market access
- Internal market - Principles
- Transport network
- Electricity supply
- Cross-border transport
- Electrical energy
- Energy grid