(1) Annex II to Implementing Regulation (EU) 2015/207 is amended in accordance with Annex I to this Regulation. (2) Annex IV to Implementing Regulation (EU) 2015/207 is amended in accordance with Annex II to this Regulation. (3) Annex V to Implementing Regulation (EU) 2015/207 is amended in accordance with Annex III to this Regulation. (4) Annex X to Implementing Regulation (EU) 2015/207 is amended in accordance with Annex IV to this Regulation.
Commission Implementing Regulation (EU) 2019/256 of 13 February 2019 amending Implementing Regulation (EU) 2015/207 with regard to changes to the models for submission of the information on a major project, for the joint action plan, for the implementation reports for the Investment for growth and jobs goal and for the European territorial cooperation goal and correcting that Regulation with regard to data for the purpose of the performance review and performance framework
(1) Annex V to Implementing Regulation (EU) 2015/207 is corrected in accordance with Annex V to this Regulation. (2) Annex X to Implementing Regulation (EU) 2015/207 is corrected in accordance with Annex VI to this Regulation.
(1) in point C.2, footnote 1 is replaced by the following: "( 1 )The Commission services provided guidance to Member States to facilitate the assessment when infrastructure investments involve State aid. In particular, the Commission services have prepared analytical grids. Commission Notice on the notion of State aid as referred to in Article 107(1) of the Treaty on the Functioning of the European Union has been published (C/2016/2946) ( OJ C 262, 19.7.2016, p. 1 ). The Commission invites Member States to make use of the analytical grids or of other methods for explaining why it is considered that the support does not involve the granting of State aid.";(2) in point C.3, the title of the last table is replaced by the following: "Flat rate method or decreased co-financing rate method (Article 61(3)(a), Article 61(3)(aa) and Article 61(5) of Regulation (EU) No 1303/2013)"; (3) in point C.3, the last table is replaced by the following: In case of decreased co-financing rate method, this formula is not applicable (flat rate is reflected in the co-financing rate of the priority axis, resulting in lower ERDF/CF financing) and the total eligible cost is equal to the amount mentioned in point 1." "Value 1. Total eligible cost before taking into account the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) (Section C.1.12(C)) <type="N" input="G"> 2. Net revenue flat rate as defined in Annex V to Regulation (EU) No 1303/2013 or delegated acts or established on the basis of Article 61(3)(aa) (FR) (%) <type="N" input="M"> 3. Total eligible cost after taking into account the requirements set out in Article 61 of Regulation (EU) No 1303/2013 (in EUR, not discounted) = (1) × (1 – FR) The maximum public contribution must respect the State aid rules and the amount of total aid granted reported above (if applicable) <type="N" input="M"> ----------------------In case of decreased co-financing rate method, this formula is not applicable (flat rate is reflected in the co-financing rate of the priority axis, resulting in lower ERDF/CF financing) and the total eligible cost is equal to the amount mentioned in point 1." (4) in point E.1.2, footnote 3 is replaced by the following: "( 3 )This does not apply: (1) for projects subject to the rules on State aids in the meaning of Article 107 of the Treaty (see point (G1), pursuant to Article 61(8) of Regulation (EU) No 1303/2013; (2) if flat rate (Article 61(3)(a) and Article 61(3)(aa) of Regulation (EU) No 1303/2013) or decreased co financing rate (Article 61(5) of Regulation (EU) No 1303/2013) is used; and (3) if the sum of the present values of operating and replacement costs are higher than the present value of revenues the project is not considered as revenue generating, in which case items 7 and 8 can be ignored and pro rata application of discounted net revenue should be set at 100 %.".
(1) point A.8 is replaced by the following: "A.8. Type of JAP ( ) Normal ( ) YEI ( ) First JAP under IGJ (*) ( ) First JAP under ETC (**) [one possibility only]; <type="C" input="M"> (*) First joint action plan submitted by the Member State under the Investment for growth and jobs goal in accordance with Article 104(3) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council (**) First joint action plan submitted by the Member State under the European Territorial Cooperation goal, in accordance with Article 104(3) of Regulation (EU) No 1303/2013 of the European Parliament and of the Council"; (2) the title of part C is replaced by the following: "C. OBJECTIVES OF THE JAP"; (3) point C.1 is replaced by the following: "C.1. Please describe the objectives of the JAP and how it contributes to the objectives of the programme or to the relevant country-specific recommendations and the broad guidelines of the economic policies of the Member States and of the Union under Article 121(2) TFEU and the relevant Council recommendations under Article 148(4) TFEU which Member States are to take into account in their employment policies. <type="S" maxlength="17500" input="M" >"(4) point C.2 is replaced by the following: "C.2. On the basis of the information provided in C.1, please set out the JAP objectives Number Code Objective JAP objective 1 <type="S" input="S"> <type="N" input="M"> <type="S" maxlength="500" input="M"> JAP objective 2" … (5) point C.3 is deleted; (6) the title of part D is replaced by the following: "D. DESCRIPTION OF THE JAP"; (7) in point D.1.1 the text in the third column of the first row of the table is replaced by the following: "JAP objective(s) to which it contributes"; (8) the title of point D.1.2 is replaced by the following: "D.1.2. How will the projects contribute to achieving the JAP objectives? Please justify."; (9) the title of point D.1.3 is replaced by the following: "D.1.3. What are the milestones, where relevant, and targets for outputs and results of these projects?"; (10) in point D.1.3, the text in the second column of the second row of the table is replaced by "the JAP indicator"; (11) point D.3 is deleted; (12) the text between points F and F1 is deleted; (13) in point F.1 the text in the second column is replaced by the following: "(Please specify the starting date of implementation)"; (14) the title of part G is replaced by the following: "G. Contribution of the JAP to horizontal principles"; (15) between points G and G.1, the following text is inserted: " Please confirm and explain how the JAP contributes to horizontal principles as set out in the relevant programme or Partnership Agreement ";(16) point G.1 is replaced by the following: "G.1. The promotion of equality between men and women <type="S" maxlength="3500" input="M" >"(17) point G.3 is replaced by the following: "G.3. The promotion of sustainable development <type="S" maxlength="3500" input="M" >"(18) point H.1.2 is replaced by the following: "H.1.2. Please provide information on the selection of the joint action plan in accordance with Article 125(3) of Regulation (EU) No 1303/2013."; (19) points H.1.2.1 and H.1.2.2 are deleted; (20) point H.4. is deleted; (21) point I.1 is replaced by the following: "I.1. Costs of achieving milestones, and targets for outputs and results (please also complete the appendix on indicators). Please fill out the following tables with the indicators to be used for the financial management of the JAP, where relevant broken down by priority axis, Fund and category of region."; (22) point I.2 is deleted.
(1) in part A, point 3.2, Table 4A (Common output indicators for the ESF) is replaced by the following table. " Table 4A Common output indicators for the ESF (by priority axis, investment priority, by category of region. For the YEI, for each priority axis or any part thereof, a breakdown by category of region is not required Investment priority: Structured data required for the report on YEI which is to be submitted in April 2015 in accordance with Article 19(3) and Annex II of Regulation (EU) No 1304/2013. Estimate based on a representative sampling. Member States have two options of reporting. Option 1: The minimum requirement is to provide data once in the 2017 AIR. In this option, a cumulative value is reported in the "Cumulative value" column in the 2017 AIR. Option 2: Annual values are provided for each year. The grand total of participants includes those with complete records (of personal non sensitive data) as well as participants with incomplete records (of personal non sensitive data). The total number of participants is calculated in the SFC2014 system based on the following three common output indicators "unemployed, including long-term unemployed", "inactive" and "employed, including self-employed". That total only encompasses participants with complete data records including all personal non-sensitive data. In the grand total of participants, Member States are required to report on all ESF participants, including those with non-complete record of personal non-sensitive data.". Indicator ID Indicator (name of indicator) Category of region (where relevant) Target value (2023) Gender breakdown optional (for the target) 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Cumulative value (calculated automatically) Achievement ratio gender breakdown optional <type="S" input="G"> <type="S" input="G"> <type="S" input="G"> <type="N" input="G"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="M"> <type="N" input="G"> <type="P" input="G"> Annual Value Total M W M W M W M W M W M W M W M W M W M W M W total M W total M W Unemployed(ESF) Unemployed(YEI) Long-term unemployed (ESF) Long-term unemployed (YEI) Inactive (ESF) Inactive (YEI) Inactive not in education or training (ESF) Inactive not in education or training (YEI) Employed including self-employed Below 25 years of age (ESF) Below 25 years of age (YEI) Above 54 years of age Above 54 years of age who are unemployed, including long-term unemployed, or inactive not in education or training With primary (ISCED 1) or lower secondary education (ISCED 2) (ESF) With primary (ISCED 1) or lower secondary education (ISCED 2) (YEI) With upper secondary (ISCED 3) or post-secondary education (ISCED 4 (ESF) With upper secondary (ISCED 3) or post-secondary education (ISCED 4 (YEI) With tertiary education (ISCED 5 to 8) (ESF) With tertiary education (ISCED 5 to 8) (YEI) Migrants, participants with a foreign background, minorities (including marginalised communities such as the Roma) (ESF) Migrants, participants with a foreign background, minorities (including marginalised communities such as the Roma) (YEI) Participants with disabilities (ESF) Participants with disabilities (YEI) Other disadvantaged (ESF) Other disadvantaged (YEI) Homeless or affected by housing exclusion (ESF) Homeless or affected by housing exclusion (YEI) From rural areas (ESF) From rural areas (YEI) Number of projects fully or partially implemented by social partners or NGOs Number of projects dedicated at sustainable participation and progress of women in employment Number of projects targeting public administration or public services at national, regional or local level Number of micro, small and medium-sized enterprise supported (including cooperative enterprises, enterprises of the social economy) Grand total of participants ----------------------Structured data required for the report on YEI which is to be submitted in April 2015 in accordance with Article 19(3) and Annex II of Regulation (EU) No 1304/2013. Estimate based on a representative sampling. Member States have two options of reporting. Option 1: The minimum requirement is to provide data once in the 2017 AIR. In this option, a cumulative value is reported in the "Cumulative value" column in the 2017 AIR. Option 2: Annual values are provided for each year. The grand total of participants includes those with complete records (of personal non sensitive data) as well as participants with incomplete records (of personal non sensitive data). The total number of participants is calculated in the SFC2014 system based on the following three common output indicators "unemployed, including long-term unemployed", "inactive" and "employed, including self-employed". That total only encompasses participants with complete data records including all personal non-sensitive data. In the grand total of participants, Member States are required to report on all ESF participants, including those with non-complete record of personal non-sensitive data.". (2) in part A, point 3.2, Table 9 (Cost of operations implemented outside the programme area (the ERDF and the Cohesion Fund under the Investment for growth and jobs goal)) is replaced by the following: In accordance with and subject to ceilings set out in Article 70(2) of Regulation (EU) No 1303/2013 or Article 20 of Regulation (EU) No 1299/2013." "1. 2. 3. 4. 5. 6. Priority axis The amount of EU support envisaged to be used for operations implemented outside the programme area based on selected operations (EUR) As a share of the EU support to the priority axis at the time of adoption of the programme (%) (3/EU support to priority axis at the time of adoption of the programme * 100) The amount of EU support in operations implemented outside the programme area based on eligible expenditure declared by the beneficiary to the managing authority (EUR) As a share of the EU support to the priority axis at the time of adoption of the programme (%) (5/EU support to priority axis at the time of adoption of the programme * 100) Cost of operations outside the programme area <type="S" input="S"> <type="N" input="M"> <type="P" input="G"> <type="N" input="M"> <type="P" input="G"> ----------------------In accordance with and subject to ceilings set out in Article 70(2) of Regulation (EU) No 1303/2013 or Article 20 of Regulation (EU) No 1299/2013." (3) in part A, point 3.2, in Table 13 (Joint action plans), the text of the eighth column of the first row is replaced by the following: "Type of JAP 1. normal 2. first JAP 3. YEI".
1. normal 2. First JAP".
"13 | 14 |
---|---|
Data for the purpose of the performance review and performance framework | |
"13 | 14 |
---|---|
Data for the purpose of the performance review and performance framework | |